Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
testing work breakdown structure | 0.79 | 0.8 | 866 | 52 | 32 |
testing | 1.09 | 0.7 | 2026 | 97 | 7 |
work | 0.62 | 0.2 | 9982 | 40 | 4 |
breakdown | 0.15 | 0.4 | 8129 | 4 | 9 |
structure | 1.73 | 0.8 | 4565 | 86 | 9 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
testing work breakdown structure | 0.91 | 0.9 | 4467 | 86 |