Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
ehr work breakdown structure | 1.32 | 0.2 | 290 | 85 | 28 |
ehr | 1.87 | 0.9 | 6309 | 23 | 3 |
work | 0.65 | 1 | 1535 | 6 | 4 |
breakdown | 0.63 | 0.8 | 1400 | 67 | 9 |
structure | 0.06 | 0.2 | 3880 | 82 | 9 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
ehr work breakdown structure | 0.72 | 0.2 | 6262 | 23 |